Specialist Diecast - Tuesday 8 October 2013 | 10:30

Lot 2692

Wells clockwork Breakdown Service Recovery Truck, lithographed in red/cream with blue lettering...

Lot 2692

Wells clockwork Breakdown Service Recovery Truck, lithographed in red/cream with blue lettering...

Estimate: £100 - £150

Share this lot

Let your friends and family know about this lot

KEY INFORMATION

Lot 2692

Full Lot Description

Wells clockwork Breakdown Service Recovery Truck, lithographed in red/cream with blue lettering and rotating Pick-up Crane jib with hand crank to rear, Wells logo on top of back section with tinplate driver figure, generally Fair to Good, a little faded 9"/23cm.

We have endeavoured to describe all toys and collectables to the best of our ability - however THIS IS NOT A WARRANTY. All toys and collectables are SOLD AS IS, all lots are accompanied by photographic images to enable you to determine the condition of the lot. Refunds cannot be provided for lots whereby the buyer has failed to notice defects, faults or issues which can be seen in the images or covered by the auction house grading system. Omission of information in the description in no way indicates the item is without flaws, missing parts/items, damage, and age wear. All items are untested unless otherwise stated. Specific condition questions are welcomed at least 24 hours prior to the start of the auction. If you cannot ascertain the information to bid with certainty, please do not bid.

By bidding on any lot, you agree to any and all of these terms.

From June 1st 2023 the Buyer's Premium for each lot will be 22.5% plus VAT (27%).

Payment for lots can be made by Credit or Debit card (we accept all major cards), by Bank Transfer, or by cheque provided we have a bank guarantee or alternative arrangements have been agreed.

BUYERS PREMIUM FOR LIVE ON-LINE BIDDING VIA INVALUABLE

Purchasers will be charged a total premium of 32% on the hammer price inclusive of VAT. This will include a charge made by Invaluable which will be shown separately on your invoice.

BUYERS PREMIUM FOR LIVE ON-LINE BIDDING VIA The-Saleroom

Purchasers will be charged a total premium of 32.94% on the hammer price inclusive of VAT. This will include a charge made by The-Saleroom which will be shown separately on your invoice.

There is no additional charge for bidding via the Vectis Live website.

If you notice an error with our Catalogue descriptions please don't hesitate to contact us.
In the unlikely event the catalogue description does not match the image provided please contact us:

If you are looking in the hard copy catalogue please check on-line first as we may have spotted the error and rectified it before a sale, if there is still a mistake please get in touch and we will endeavour to correct the error.

If you notice during or after an auction please note that we will always sell a lot based on the description rather than the image.

If you have any queries please contact us on +44 (0) 1642 750616 or email admin@vectis.co.uk

Got one to sell?

Contact our Collections Team who will guide you through the process. We sell over 98% of all items consigned to our auctions.

Continue Browsing

See more

LOT 2693

Wells clockwork Saloon Car in blue with red lining, tinplate driver figure, Wells logo to boot...

Starting Bid: £180

LOT 2694

Mettoy an unusual clockwork Military Saloon Car and Caravan consisting of Saloon Car in...

Starting Bid: £540

LOT 2695

Mettoy clockwork large open wheel Racing Car, lithographed in red/orange with black/cream lining...

Starting Bid: £80

LOT 2696

CIJ (France) clockwork Renault Nervasport open wheel Racing Car with composition driver figure...

Starting Bid: £200

LOT 2697

Modern Toys (Japan) battery operated mystery action Racing Car with driver torso part of car...

Starting Bid: £90

LOT 2698

Wells clockwork Saloon Car, blue with red lining and tinplate driver figure, Good, 8"/22cm.

Starting Bid: £80

LOT 2699

Gotz Und Sohn (GoSo) clockwork Coca Cola Delivery Lorry consisting of cab with long bonnet,...

Starting Bid: £120

LOT 2700

Mettoy clockwork diecast body Rolls Royce, orange with plastic chassis with metal front and rear...

Starting Bid: £50

LOT 2701

Triang Minic 3 x small friction plastic Rolls Royce's, one blue, one yellow and one green, the...

Starting Bid: £30

LOT 2702

JL Hess friction/flywheel powered Hessmobil 1022 and Sedan Car with driver figure with open cab...

Starting Bid: £260

LOT 2703

Bing Car and Garage set consisting of lithographed tinplate twin garage with opening doors,...

Starting Bid: £500

LOT 2704

Chein (USA) (?) clockwork Fancy Groceries Delivery Van, c.1915, of fairy simple construction but...

Starting Bid: £80

LOT 2705

Rossignol (France) clockwork Single Deck Paris Bus in green/cream with open central cab to front...

Starting Bid: £200

LOT 2706

Metalcraft Corp. St Louis USA an unusual pressed steel Heinz Delivery Lorry (pullalong), cream...

Starting Bid: £100

LOT 2707

Structo (USA) 2-seat open wheel Racing Car of simple form, painted in green with black radiator...

Starting Bid: £45

LOT 2708

Alps Japanese c.1957 friction Chrysler New Yorker 4-seat Sedan, lithographed in blue with cream...

Starting Bid: £1,500

Newsletter Signup

Keyword Alerts